in Aba Nigeria sales price shop near me near me shop factory supplier Heavy Duty Horizontal CNC Lathe Machine for Grinding Oil Drill Pipe Collars manufacturer best Cost Custom Cheap wholesaler

  in Aba Nigeria  sales   price   shop   near me   near me shop   factory   supplier Heavy Duty Horizontal CNC Lathe Machine for Grinding Oil Drill Pipe Collars manufacturer   best   Cost   Custom   Cheap   wholesaler

Due to our broad solution range and abundant encounters in this business, EPG has been successfully certified by ISO9002 High quality Management System, ISO9001 Top quality Management Program, API certificate, ISO/TS16949:2002 and ISO10012 measurement management program. focus in electricity transmission goods, CATV merchandise, mechanical seal, hydraulic and Pheumatic, and advertising products.
EPT Duty Horizontal CNC Lathe with 50 a long time experience
For EPT Oil EPT Collars commaCylinders comma EPTT Shaft commaEPT Mold comma Railway Components commaWheel Hub Turbine commaFlange commaetc

1 period of time OutstXiHu (West EPT) Dis.Hu (West EPT) Dis. Traits colon

EPTT CNC Lathe colon All elements of EPTT are EPTTed from overseas well-known brands comma these kinds of as FANUC or SIMENS EPTT System sol SchneiEPTTEPT EPTT technique comma Japanese EPTT comma ABB EPT amp EPTT box solEPT box comma and so forth time period We can also configurate for each consumer aposs EPTT request and needs time period Our Engineers can design and style different lathe EPTTs in accordance to distinct workpieces attributes period

one rpar period of time Have Load as EPT as Possible colon Internationally forerunner computation technologies and optimized finite aspect examination techniques are adopted and the chosen components are suitable for the design time period

2 time period rpar time period EPT Rigidity comma Security and EPT Servicing colon All castings are made of large-energy meehanite EPTT250 period which is specifically ideal for heavy slicing interval All huge castings stand the examination of annealing and vibration growing older and internal tension is eliminated comma so the all round precision is greatly enhanced and processed components are identified with large geometric accuracy period

three interval rpar One particular-piece framework created of meehanite comma tremendously enhXiHu (West EPT) Dis.Hu (West EPT) Dis.ng its abrasion resistance comma and the inside drive elimination method generates high vibration resistance and significantly enhances stability interval The cross-formed foundation and rectangular bearing construction ensure substantial structural security and permanently steady high quality interval

4 interval rpar The lathe bed is in fastened hefty slicing framework comma incXiHu (West EPT) Dis.Hu (West EPT) Dis. rectangular difficult rails examined by EPT warmth treatment and high-precision surface grinding lparstraightness in complete stroke lt0 period05mm rpar period of time

five time period rparTurcite-B is pasted on the sliding area in orEPTTto increase the rail aposs smoothness and wearing resistance period The widened tough rail design can provide needed resistance and balance for heavy cutting period of time

6 interval rpar The headstock comma produced of substantial strength and substantial rigidity keel rib comma is in EPTT cage condition comma and the EPTT incEPTTs course P5 grinding EPTs comma which can provide appealing driving accuracy and better torque period

seven period of time rpar Incorporating German AM technologies comma the major shaft is created of chrome-molybdenum alloy and proves high precision comma high rigid and attractive deformation resistance right after tough solfinish machining comma carbonization comma ageing treatment method and precision grinding period The motor figures substantial output lpar26kw rpar and the max period of time rev interval is 3000RPM time period Soon after the principal shaft assembling is accomplished comma the complete assembly shall be calibrated by dynamic stability examination period of time The independent lubrication will further improve the security of the headstock during procedure period

8 period of time rpar StXiHu (West EPT) Dis.Hu (West EPT) Dis.rd 4 knife library comma mounted on a turret utilised in precision turning period of time

9 time period rpar The tailstock is made up of two parts colon the upper 1 incEPTTs a sleeve relocating mechanism comma spindle assembly comma and a shaft cEPTTrline adjustment system comma with a rectangular head in the rear comma which is designed to lock the sleeve manually semi and the lower a single incEPTTs a tailstock quickly-shifting motor and a locking system comma with the major shaft put in on the large-precision radial clearance-adjustable double-row cylindrical roller bearing in the sleeve comma rendering the substantial-precision rotating leading on the tailstock period of time However comma in orEPTTto satisfy certain EPTT specifications of the machining method comma it is possible to transfer the plug board from the flange groove in the entrance of the sleeve to the groove near the front conclude of the principal shaft in orEPTTto correct the major shaft and acquire a EPT cEPTTr period of time

ten rpar Stringent EPTT EPTT colon The major components are inspected strictly by the Inspecting Authority to guarantee an excellent quality interval

The pursuing picture is the principal EPTT components inspected by the 3rd Celebration Inspection period of time

Our Theory colon MaXiHu (West EPT) Dis.mize Buyer aposs Profitability unEPTTthe minimal spend EPT interval

Software colon This collection CNC horizontal lathe can uEPTTze high-pace metal and carbide slicing resources to finish tough or finish turning approach for not only the non-ferrous metals like different composition steels comma casting steels and irons comma but also the external solinternal cylindrical sol conical sol spherical surfaces comma thread of non-metallic supplies and all sorts of the area of curve rotary physique interval What aposs far more comma it can also comprehend the constant pace cutting line interval

two period EPTnical Parameters

Identify CG61100 CG61125 CG61160 CG61200 CG61250 CG61300
Description Unit
Max time period EPTg In excess of Bed mm a thousand 1250 1600 2000 2500 3000
Max interval EPTg In excess of the skateboard mm 650 800 1200 1650 1800 2800
Max time period WeigEPTT of Function-piece T 10 15 20 twenty twenty forty
Max interval Duration of Operate-piece mm 3000-12000
EPTs of Spindle Velocity sol Infinitely Variable Velocity solstep-significantly less velocity
Range of Spindle Velocity r solMin ten-three hundred 10-two hundred 10-a hundred and sixty four-80 four-80 1 period6-63
Chuck Diameter mm 800 1000 1250 1600 2000 2500
X commaZ-AXiHu (West EPT) Dis.s Feed Variety mm solMin -3000
Horizontal Stroke mm five hundred 625 800 a thousand 1250 one thousand
EPTTitudinal Stroke mm 3000-12000
Primary Driving EPT Kw eleven 22 forty five 75 seventy five seventy five
Chopping Drive lparCarriage rpar Kn 4 6 20 40 40 60
Sleeve Diameter of EPTTilstock mm 180 a hundred and eighty 290 290 290 480
Spindle Diameter of tailstock mm one hundred twenty five one hundred twenty five one hundred sixty one hundred sixty a hundred and sixty 240

Rermarks colon

1 period The previously mentioned six versions of EPT Responsibility Horizontal Lathe EPTT are the stXiHu (West EPT) Dis.Hu (West EPT) Dis.rd configurations comma we can also style and manufacture EPT lathe EPTTs according to the user aposs workpiece attributes period It can be handbook or CNC management comma each are obtainable period

2 period of time This sequence large duty horizontal Lathe has been exported to Norway comma TEPTTd comma Romania comma Iran comma Russia comma Chile for machining railway areas comma vehicle parts comma mining and metallurgy comma delivery developing comma wind EPTT and other EPTTry business time period

three interval Package deal and Cargo

Anti-Rust Oil sol Anti-Corrosive Oil for the EPTT EPTT comma then wrapping the protecting film

EPTen Box Package deal comma or vacumm bundle is also available in accordance to customer aposs EPTT ask for period of time

4 period Following-sale Support amp Routine maintenance

one period We provide expert complex education for consumers apos operators and upkeep staff to allow them to correctly use and work the lathe and carry out standard maintenance period of time

two period Warranty period of time colon 1 year soon after acceptance of the lathe period of time

3 time period In circumstance of any top quality issue discovered throughout procedure comma the manufacturing facility will dispatch personnel to the user aposs area in 48 hours lpardomestic users rpar amp inside of three daEPTT lparEPT Consumer rpar and the complex staff received apost go away prior to resolving the malfuntion interval

4 period The business will freely offer different EPT and mechanical elements for the obtained lathe timely within guarantee period of time period of time

five period The company will provide life span guarantee for the consulting companies in conditions of software comma routine maintenance comma fix comma renovation comma and many others of equipments period

For much more details comma please feel free to make contact with us period Thanks excl

  in Aba Nigeria  sales   price   shop   near me   near me shop   factory   supplier Heavy Duty Horizontal CNC Lathe Machine for Grinding Oil Drill Pipe Collars manufacturer   best   Cost   Custom   Cheap   wholesaler

  in Aba Nigeria  sales   price   shop   near me   near me shop   factory   supplier Heavy Duty Horizontal CNC Lathe Machine for Grinding Oil Drill Pipe Collars manufacturer   best   Cost   Custom   Cheap   wholesaler